Before a project over one acre can be started, a Notice of Intent (NO11 must be filed with Nevada Division of Environmental Protection (NDEP). This is your "Permission to Discharge Stormwater" from your site. Without this permit, an operator cannot begin construction.

If an operator has multiple projects, not part of an umbrella project, each project must have its own permit. An operator is defined as a company that has operational control over the plans and specifications. If the owner is different than the operator, they must be named on the permit, as well.

Your stormwater permit is not your grading or dust permit, however, like these other permits: you can be fined or shut down if you begin soil disturbing activities without one.

Strategic Permitting is an important part of your Stormwater Compliance Program. Limiting your liability is Key Ems Environmental can assist you with this process by strategically preparing and filing the necessary paperwork, so you may obtain a NO1 that keeps you in compliance, while limiting your liability.

 

 

 

 

 